Articles
Telecommunications networks and stations: ensuring operation in the event of blackouts with BESS Telecommunications networks are an essential infrastructure, ...
The rapid deployment of electric vehicle (EV) charging infrastructure in the C&I sector creates significant challenges in managing contracted power. The BESS acts as an energy buffer,…
The rapid deployment of electric vehicle (EV) charging infrastructure in the C&I sector creates significant challenges in managing contracted power. The BESS acts as an energy buffer, enabling the deployment of efficient and cost-effective DC fast and ultra-fast chargers without the need to over-dimension the grid connection infrastructure.
Alexandre Morant, responsible for Renewable Energies products at Vector Energy
Article published in the No. 254 of the magazine Energética21
The electrification of fleets and the installation of hubs In C&I environments, load-balancing faces a key challenge: the instantaneous power demands of high-capacity DC chargers. The peaks generated by ultra-fast charging can greatly exceed the contracted power of the installation, resulting in:
The BESS solves this problem by acting as a “virtual charging station”. The system decouples the charging power of the EV from the power absorbed from the grid, allowing the company to optimize the demand charge (the cost of the contracted power) and the use of its point of connection (POC).
The application of peak shaving dynamic It is the most immediate economic functionality of the BESS. Its objective is to limit the maximum network power.
The BESS, which charges slowly from the grid during off-peak hours (P3) or with FV production in self-consumption facilities, manages instantaneous power, optimizing both fixed and variable costs.
The correct sizing ensures profitability and functionality:
Additionally, the BESS facilitates price arbitrage within the Spanish tariff framework: it stores grid energy during off-peak hours (minimum cost) or during photovoltaic generation on the roof, and injects it into loads during peak hours when costs are higher. This arbitrage strategy, combined with the peak shaving, This accelerates the Return on Investment (ROI) of the BESS.
The BESS is not just a battery; it is a key element in active fleet management and smart charging (Smart Charging).
The integration of the BESS solves the most pressing problem of deploying VE infrastructure in C&I: the power limitation. BESS systems become essential for the technical and financial viability of fleet electrification.
Looking to the future, these storage assets will not only benefit the individual company, but will be integrated into the global electricity system. The BESS in C&I, through demand aggregators, will be able to offer flexibility services to the grid (such as frequency or voltage regulation), turning the hub of load in a distributed resource and opening a new revenue channel through availability for the Spanish C&I sector.
More information about BESS storage solutions SUNVEC Storage