6 August 2023

Installation of photovoltaic self-consumption (60kW grid-connected SUNVEC inverter)

Installation of photovoltaic self-consumption (60kW grid-connected SUNVEC inverter)

New industrial photovoltaic self-consumption installation with a 60kW SUNVEC grid inverter, at a butter factory in Estepa (Seville).

Congratulations Sedelsur SL Manuel Llamas Camacho

 

 

More information about Investors of the SUNVEC network

Contact us for more information or any questions:

Phone numbers: 935 748 206
Tel. SAT Sunvec: 937 617 771

You might be interested in